How do I calculate my dishwasher's finish time?
+
1. Select Cycle: Note your chosen cycle duration (e.g., Normal = 2 hours).
2. Enter Target: When do you need the clean dishes?
3. Set Delay: If it's 3 PM and you need dishes at 6 PM with a 2-hour cycle, set a 1-hour delay.
What are your dishwasher loading and drying tips?
+
Loading: Angle cups and bowls to prevent water pooling on tops.
Auto-Open: If your machine auto-opens at the end of the cycle, factor in an extra 20 mins of air drying.
Energy: Save on utility bills by using delay start for off-peak electricity hours.